Chapter 2: Installation
42
3. Mount the switch in a standard 19-inch equipment rack using four
equipment rack screws (not provided with the switch). See Figure 11.
Figure 11. Mounting the Switch in an Equipment Rack
4. Go to “Installing SFP Transceivers” on page 43 or skip to “Cabling the
Switch” on page 46 if not installing SFP transceivers.