Allied-telesis SwitchBlade x8106 Manuale Utente Pagina 140

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 139
Chapter 6: Installing the Transceivers and Cabling the Ports
140
Note
To remove the connector and cable from the SFP+ slot, gently push
on the connector, pull on the release tab, and then slide the
connector from the slot.
After installing the AT-SP10TW Cables in the AT-SBx81XS6 Line Card, do
one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 7,
“Powering On the Chassis” on page 143.
Vedere la pagina 139
1 2 ... 135 136 137 138 139 140 141 142 143 144 145 ... 239 240

Commenti su questo manuale

Nessun commento